Concrete arrives in 5–9 m³ mixers. Under-ordering is expensive: a second truck for the shortfall costs almost as much as a separate delivery, and the joint between layers weakens the structure.
Strip foundation
Volume = strip length × width × height.
Example: a 10×8 m perimeter plus one 8 m internal wall. Strip length = 36 + 8 = 44 m. Width 0.4 m, height 0.8 m. Volume = 44 × 0.4 × 0.8 = 14.1 m³.
Raft foundation
Volume = slab area × thickness. For a 10×8 m slab 25 cm thick: 80 × 0.25 = 20 m³. If the raft has stiffening ribs, calculate their volume separately and add it.
Pile cap
Volume of one pile = π × R² × depth. For a ⌀300 mm pile 2 m deep: 3.14 × 0.15² × 2 = 0.141 m³. Twenty piles come to 2.8 m³, and the cap is calculated like a strip.
Which concrete class
| Class | Grade | Typical use |
|---|---|---|
| C12/15 | M150 | Blinding, screeds |
| C16/20 | M250 | Strip for a single-storey house |
| C20/25 | M300 | Raft, pile cap, two storeys |
| C25/30 | M400 | Loaded structures, floors |
Spare
Allow 5–7% above the calculated figure. The reasons never change: an uneven trench bottom, formwork spreading under the pressure of the concrete, losses during placement. On 14 m³ that is almost a full cubic metre — and it is exactly the one that runs short.
We deliver by mixer at an agreed time. A large pour must be planned for a single day: a break of more than two hours between layers creates a cold joint and the slab loses its monolithic strength. Tell the manager the volume and timing and we will schedule the trucks.
You can work out weight and cost for your volume right here — or leave a request and a manager will quote it with a batch discount.
We stock these positions in Building materials.
Buy with delivery in Kyiv
Terms, sizes and prices for each item separately, with a calculation for your site.