Building materials · Kyiv

Buy ready-mix concrete in Kyiv

Ready-mix concrete for foundations, screeds and slabs. We match the grade to the structure and agree the volume and delivery slot.

Concrete for foundations, screeds and slabs

The grade is chosen for the structure, not for maximum strength. Blinding and preparation use low grades; a house strip foundation usually takes M200 to M250; monolithic slabs and raft foundations go higher. Strength class is marked with B: M250 corresponds roughly to B20. Over-specifying costs money and is not always helpful, because a stiffer mix places poorly in a narrow formwork.

Volume is calculated before the call, not on site. For a strip it is perimeter × width × height; for a slab, area × thickness, plus an allowance for an uneven base. A concrete order is always tied to time: the mix has a limited working life in the truck, so formwork, reinforcement and people must be ready when it arrives.

Sizes

What to confirm before ordering

  • type of structure
  • required grade or class
  • volume in cubic metres
  • address and truck access
  • date and time of delivery

A manager quotes for your volume and delivery address — send a request or call us.

Terms

How we handle concrete

Grade selection

Tell us what you are pouring and we will suggest the grade for the structure, not the strongest available.

Volume calculation

We work out the cubic metres from your dimensions with an allowance, so a second truck is not called for 0.3 m³.

Timing agreed

We agree the delivery slot: concrete arrives when the formwork and the crew are ready.

Questions and answers

Concrete questions

Which grade suits a strip foundation?

Private houses usually work around M200 to M250. The exact grade comes from the design and depends on load, soil and foundation type.

How much concrete do I need?

For a strip, multiply perimeter by width and height; for a slab, area by thickness. A worked example is in our reference section.

What do M250 and B20 mean?

M is the old compressive-strength grade, B is the modern class. M250 corresponds roughly to B20; both appear on the paperwork.

How long is there to place it?

The mix stays workable for a limited time after loading, and less in hot weather. Formwork, reinforcement, vibrator and crew are prepared before the truck arrives, not after.

Price the concrete for your site

Send the foundation or slab dimensions and we will calculate the volume, match the grade and agree a delivery slot.